SECTION 165:10-15-5. Discovery oil allowables  


Latest version.
  • (a)   Number of barrels of oil per day and duration of the discovery allowable period. The maximum number of barrels of oil per day and the duration of the discovery allowable period shall be determined from the Discovery Allowable Table (Appendix B to this Chapter) or the Allocated Well Allowable (Appendix A to this Chapter), whichever is greater, provided that the well is in compliance with the other provisions of this Section and other rules pertaining to allowables. If the well is not capable of producing at the discovery rate without causing preventable waste, the temporary discovery allowable shall be the capacity of the well to produce as reported, unless otherwise limited by the Commission.
    (b)   Effective date of discovery allowable.
    (1)   The discovery allowable period for the pool shall begin with the date of first completion of the discovery well of the pool and extend as provided in the Discovery Well Allowable Table (Appendix B to this Chapter).
    (2)   The discovery allowable period for each well in the pool shall run from the date specified under 165:10-15-7 for each well to the date of termination of the pool, if granted administratively.
    (3)   If application, notice, and hearing are required, the effective date of the discovery allowable period shall be specified by an order of the Commission, provided that such date shall not precede the date of filing of the application. The date of expiration of the discovery allowable shall still be determined as set forth in (1) of this subsection.
    (c)   Gross allowable production. The gross allowable production for any proration period from a well in a discovery pool may, at the option of the operator, be produced at any time during the proration period; however, in no event shall the production exceed the maximum efficient rate of flow.
[Source: Amended at 26 Ok Reg 2498, eff 7-11-09]