  • (a)   Spill prevention. Each facility shall be designed and constructed utilizing good engineering practices. Design and construction standards shall be determined on a case-by-case basis by the Commission. Each such facility shall be designed and constructed to prevent escape of deleterious substances.
    (b)   Unloading pits or sumps. All unloading areas at tank bottom hydrocarbon recycling/reclaiming facilities that use a pit to receive fluids and skimming pits shall be approved on OCC Form 1014.
    (c)   Required exhibits. Complete construction plans, drawings, and written specifications for the proposed facility shall be submitted to the Manager of Pollution Abatement for review and approval. Design and construction standards shall be determined on a case-by-case basis by the Commission. Applicants shall consult with the Commission prior to the construction of the proposed facility. The Commission may apply existing technological standards and/or establish new standards, as it deems appropriate to the proposed site and activities. All plans, drawings, and specifications shall be prepared by or under the supervision of a qualified expert.
[Source: Added at 11 Ok Reg 3691, eff 7-11-94; Amended at 17 Ok Reg 1860, eff 7-1-00]