SECTION 165:25-8-3. Over-water piping at marinas  


Latest version.
  • (a)   The design, fabrication, assembly, test, and inspection of the piping system from the fuel tank to the fuel dispensers must be in accordance with NFPA 30 and NFPA 30A.
    (b)   The piping must be installed according to the manufacturers installation recommendations and instructions.
    (c)   Piping must be listed and approved by the manufacturer for aboveground installations.
[Source: Added at 23 Ok Reg 137, eff 10-6-05 (emergency); Added at 23 Ok Reg 2261, eff 7-1-06]