SECTION 165:35-39-11. Generator Availability and Dispatch  


Latest version.
  •   Schedule G of the MFR Package shall include generator availability and dispatch during the Review Period and a narrative description of the same, including Material Deviations from planned operations including the following:
    (1)   A tabular summary of the monthly availability and output of each utility generating unit and any major non-utility generating unit under long-term contract to the extent available;
    (2)   A narrative description of each generating unit utilized by the utility during the Review Period, the manner in which it operated (i.e. baseload energy, peaking, load following service, ancillary services, etc.) during the Review Period, and the annual average heat rate achieved by each generating unit during the Review Period including the actual average monthly heat rate by including MMBtu burned per unit per month and the KWH generated each month for each unit;
    (3)   A narrative explanation of all significant unusual events with respect to generating unit availability and the extent to which the events affected the utility's fuel and purchased power expenses;
    (4)   A list of forced and scheduled outages and deratings whether it was an unplanned outage or forced outage that occurred during the fuel Review Period. Information submitted should contain unit name, date started, date ended, duration of outage or power reduction in hours, reason for outage or information may be reported consistent with North American Electric Reliability Corporation (NERC) Generating Availability Data Survey (GADS) reporting requirements in effect during the Review Period for each utility generating unit, including a description of the reason(s) for each outage and derating;
    (5)   Description and explanation of any limitations on the output of utility generating units, including excess supplies or shortages of fuel; and
    (6)   A tabular summary of utility owned wind generation which includes:
    (A)   Name of wind facility;
    (B)   Name plate capability for each facility;
    (C)   Monthly capacity factor for each facility;
    (D)   Annual capacity factor for each facility;
    (E)   Actual MWH output;
    (F)   Unit value amount of PTC (credit/MWH);
    (G)   PTCs generated; and
    (H)   REC information, including amount sold, sales revenue, and expiration dates.
[Source: Added at 24 Ok Reg 1827, eff 7-1-07; Amended at 28 Ok Reg 2252, eff 7-25-11]