Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 205. Hazardous Waste Management |
Subchapter 11. Additional Permit Procedures |
SECTION 252:205-11-2. Exclusionary siting criteria
Latest version.
- (1) Presumption of unapprovable site. The DEQ shall presume that the proposed location is unapprovable if it lies wholly or partially within an area designated as an actual or potential unconsolidated alluvial aquifer or terrace deposit aquifer or bedrock aquifer or recharge area, as shown on the maps described as "Sheet 1 - Unconsolidated Alluvium and Terrace Deposits" and "Sheet 2 - Bedrock Aquifers and Recharge Areas" of the "Maps Showing Principal Ground Water Resources and Recharge Areas in Oklahoma," compiled by Kenneth S. Johnson, Oklahoma Geological Survey (1983), or any successor map(s) compiled by the Oklahoma Geological Survey.(2) Rebuttal of presumption. The applicant may rebut the presumption by submitting site-specific hydrological and geological data and other information sufficient to demonstrate clearly and convincingly that the proposed location does not lie in a prohibited area.(3) DEQ reliance upon Oklahoma Geological Survey. In making a determination whether a proposed location is within a prohibited area, the DEQ shall request and rely upon review and conclusions by the Oklahoma Geological Survey.(4) Site-Specific Information. The Department may require site-specific hydrological and geological information for proposed facility locations outside a designated principal groundwater resource or recharge area where there is reason to believe that the proposed location may be unsuitable due to localized groundwater conditions.(5) Groundwater protection plan. In determining whether a groundwater protection plan with financial assurance is required for an on-site facility pursuant to 27A O.S. § 2-7-111(B), the procedures used in subsections (1)-(4) of this section shall be used.(6) Existing facilities. Existing facilities in these areas may continue to operate and may modify or expand their operations to the extent permitted by 27A O.S. § 2-7-111.(b) Water wells. The DEQ shall not grant a permit for a new hazardous waste disposal facility proposed to be located within one-quarter mile of any public or private water supply well except private water supply wells on the applicant's property. Water supply wells that are demonstrated by the applicant to be permanently abandoned may be plugged upon a demonstration that the applicant has the right to plug them. The applicant shall notify the DEQ that the abandoned water wells have been plugged. If abandoned water wells are identified by the applicant during the preparation of his application or during the permit process, the applicant shall notify the DEQ so that these wells can be included in the Class V well inventory.(c) Flood plain. No permit or modification of an existing permit which includes disposal of hazardous waste within a one-hundred year flood plain shall be granted, except for post-closure, corrective action or remedial activities conducted under the direction of the DEQ. For existing facilities, this modification prohibition applies only to land disposal units and to modifications of such units which would increase disposal rates or designate new areas for disposal.(d) Surface water. No permit shall be granted for a new hazardous waste disposal facility proposed to be located within one mile of the conservation pool elevation of any reservoir which supplies water for a public water supply or within one mile of any scenic river.(e) Air pollution. No permit shall be granted for a new off-site hazardous waste disposal facility proposed to be located within one mile of any public school, educational institution, nursing home, hospital or public park.(f) The Hazardous Waste Management Act also contains exclusionary siting criteria. See 27A O.S. § 2-7-111(B) and (C)(1) and § 2-7-114, as amended.