Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 205. Hazardous Waste Management |
Subchapter 5. Additional Generator Requirements |
SECTION 252:205-5-3. Quarterly reporting requirements
Latest version.
- (a) General. All persons generating hazardous waste within Oklahoma including on-site treatment, storage, recycling, or disposal facilities, shall submit a report to the DEQ in a prescribed format which may include electronic submissions. The quarterly report shall be submitted no later than 60 days after the end of each quarter.(b) Content. Quarterly reports shall include the total amount of hazardous waste generated and, when applicable, for each hazardous waste generated in a quarter:(1) The appropriate waste stream number from the generator's disposal plan;(2) The EPA ID number of all transporters who transported the waste;(3) The EPA ID number of the receiving facility; and(4) The handling code(s) corresponding to the method the generator expects the designated receiving facility to use.(c) Characteristic hazardous waste. If characteristic hazardous waste is treated on-site to render it non-hazardous, the quarterly report shall so indicate.(d) Reporting exclusions. This section does not apply to waste which is not subject to the substantive federal regulations adopted by reference by 252:205-3-2. There are many such exclusions, including but not limited to:(1) Hazardous wastewater which is properly disposed of on-site in facilities permitted under the Clean Water Act;(2) Hazardous wastewater which is properly disposed of on-site in Class I injection wells permitted under the Safe Drinking Water Act; and(3) Hazardous wastes which are treated in elementary neutralization units to render them non-hazardous.