SECTION 252:410-20-3. Control devices and testing  


Latest version.
  •   Any permittee whose radiation machine produces a high radiation area into which humans can enter shall comply with the following:
    (1)   The controls required by 10 CFR 20.1601(a)(1) shall be constructed in such a manner that the primary radiation cannot be reactivated until all entrances have been secured, and the radiation on/off control is reset at the control panel.
    (2)   The controls required by 10 CFR 20.1601(a)(1) shall be constructed in such a manner that when the warning device is activated, it shall be necessary to shut off the system and secure all tripped entrances prior to being able to de-activate the alarm system.
    (3)   Control devices required by 10 CFR 20.1601(a)(1) and (2) shall be tested for proper operation at intervals not to exceed six months. If such testing indicates failure of the device, corrective action shall be taken immediately to restore the control device to proper working order.
    (4)   Each permittee shall prepare a record of control device tests that indicate the date of testing, the person who tested, the test results and corrective actions taken or planned.
[Source: Added at 17 Ok Reg 1136, eff 6-1-00]