SECTION 252:515-11-75. Protective layer  


Latest version.
  •   Upon completion of construction or excavation, the in-situ liner must be covered with a 12-inch soil protective layer and maintained to minimize desiccation.
[Source: Added at 20 Ok Reg 1151, eff 6-1-03]