SECTION 252:515-19-55. Soil borrow areas


Latest version.
  •   On- and off-site soil borrow areas which are no longer to be used to obtain soil shall be reshaped and revegetated, or otherwise reclaimed, to blend with surrounding terrain within 180 days of the date the area ceased being used.
[Source: Added at 20 Ok Reg 1151, eff 6-1-03]