SECTION 252:515-25-35. Final closure  


Latest version.
  • (a)   DEQ approval required. The DEQ must approve the final closure of a facility before the post-closure period can begin.
    (b)   Extension of closure period. The DEQ may extend the closure period and require the posting of additional financial assurance if:
    (1)   any testing shows the confirmed presence of elevated levels of any constituent;
    (2)   any evidence of contamination related to site operations has been found; or
    (3)   final closure of the site is found to be inadequate.
[Source: Added at 20 Ok Reg 1151, eff 6-1-03]