SECTION 252:515-3-79. Top of liner contour map  


Latest version.
  • (a)   Required map. The permit application shall include a top of liner contour map showing:
    (1)   contours, at two foot intervals, of the top of the liner; and
    (2)   the locations of the proposed monitor wells.
    (b)   Liner construction. Details of liner construction may be provided on this map or as a separate drawing.
[Source: Added at 20 Ok Reg 1151, eff 6-1-03]