Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 515. Management of Solid Waste |
Subchapter 31. NHIW Management |
SECTION 252:515-31-3. Generator requirements
Latest version.
- (a) Certification required. For each NHIW to be disposed in an Oklahoma solid waste disposal facility, generators, or persons identified in 27A O.S. § 2-10-501(H)(1), shall submit a certification to the DEQ that the NHIW is not a hazardous waste.(b) Certification requirements. The certification shall be made in accordance with Appendix G of this Chapter, or contain equivalent information.(c) Process or wastestream changes. In the event the NHIW generating process or resultant wastestream changes, the generator shall immediately notify the DEQ of such change and update the appropriate certification.(d) Verification. The DEQ may require the generator to provide documentation in support of the certification. Such documentation may include, but not be limited to, laboratory analysis, material safety data sheets, or additional information regarding the wastestream or generation process.(e) Compliance with other laws. The provisions of this Section do not relieve a generator from the requirements of 40 CFR 262.11 or any other State or Federal laws, rules, or regulations.