Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 515. Management of Solid Waste |
Subchapter 39. Oklahoma E-Waste Recycling |
SECTION 252:515-39-3. General provisions
Latest version.
- (a) Plan required. A manufacturer shall not sell or offer for sale and/or import a covered device in this state unless the manufacturer has adopted and is implementing a recovery plan, either alone or in cooperation with other manufacturers and the DEQ has reviewed and approved of said plan.(b) Plan submission. The manufacturer shall submit recovery plans to the DEQ annually on or before March 1st.(c) Geographically central. If a manufacturer's recovery plan only includes the requirements of § 2-11-605(D)(2) or (3) as allowed by the Act and if a consumer resides over one hundred (100) miles from the closest staffed physical collection site or collection event within the state offered by the manufacturer, the manufacturer must provide for a no cost mail back-system meeting the requirements of 27A O.S. § 2-11-605(D)(1).(d) Designated manufacturer. If a manufacturer produces, sells or imports fifty (50) or more covered devices within the state per calendar year and has not submitted a recovery plan, the DEQ may designate a manufacturer or manufacturers as allowed by the Act.