SECTION 252:515-7-1. Applicability  


Latest version.
  • (a)   Land disposal facilities. A subsurface investigation meeting the requirements of this Subchapter shall be completed prior to submitting a permit application for:
    (1)   a new land disposal facility; or
    (2)   an expansion of waste disposal boundaries of an existing land disposal facility.
    (b)   Other solid waste disposal facilities. A subsurface investigation meeting the requirements of this Subchapter shall be performed at other solid waste disposal facilities if the DEQ has determined groundwater may be affected due to the presence of the facility.
    (c)   Part of permit application. The results from the subsurface investigation shall be included as part of the permit application.
    (d)   Exception. Except as provided by OAC 252:515-7-2(c) (relating to verification of previously submitted data), a permit modification to expand waste disposal boundaries may not require a subsurface investigation if the proposed expansion area has already had a subsurface investigation performed that meets the requirements of this Subchapter.
[Source: Added at 20 Ok Reg 1151, eff 6-1-03]