SECTION 252:515-7-51. General  


Latest version.
  • (a)   Groundwater study required. A groundwater study completed in accordance with this Part shall be performed as part of the subsurface investigation required by this Subchapter, and the results included with the permit application.
    (b)   As-built drawings required. As-built drawings, surveyed locations, and casing elevations of each piezometer installed shall be included with the permit application.
[Source: Added at 20 Ok Reg 1151, eff 6-1-03]