SECTION 252:517-3-36. Site map  


Latest version.
  • (a)   Required map. The permit application shall include a site map, which may be the existing contour map.
    (b)   Required details. The site map shall show the following, as applicable to the facility:
    (1)   the dimensions of the permit boundary as indicated by legal description;
    (2)   the receiving processing, storage or disposal areas;
    (3)   buffer zones;
    (4)   the locations and surface elevations of each borehole, monitor well, test well, monitoring site, test pit, sampling site and permanent benchmarks;
    (5)   the surface and top of casing elevations for each monitoring well;
    (6)   the surface drainage, including location of diversion ditches, dikes, dams, pits, ponds, lagoons, berms, terraces and other relevant information;
    (7)   the location of fencing and gates, utility lines, pipelines, and easements;
    (8)   the access roads into and on the site;
    (9)   employee and equipment shelters; and
    (10)   on- and off-site soil borrow areas.
[Source: Added at 33 Ok Reg 1469, eff 9-15-16]