Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 517. Disposal of Coal Combustion Residuals from Electric Utilities |
Subchapter 5. Location Restrictions |
SECTION 252:517-5-4. Seismic impact zones
Latest version.
- (a) Applicability. New CCR landfills, existing and new CCR surface impoundments, and all lateral expansions of CCR units must not be located in seismic impact zones unless the owner or operator demonstrates by the dates specified in paragraph (c) of this Section that all structural components including liners, leachate collection and removal systems, and surface water control systems, are designed to resist the maximum horizontal acceleration in lithified earth material for the site.(b) PE certification. The owner or operator of the CCR unit must obtain a certification from a qualified professional engineer stating that the demonstration meets the requirements of paragraph (a) of this Section.(c) Compliance dates; DEQ approval required. The owner or operator of the CCR unit must complete the demonstration required by paragraph (a) of this Section by the date specified in either paragraph (c)(1) or (2) of this Section.(1) For an existing CCR surface impoundment, the owner or operator must complete the demonstration no later than October 17, 2018.(2) For a new CCR landfill, new CCR surface impoundment, or any lateral expansion of a CCR unit, the owner or operator must complete the demonstration no later than the date of initial receipt of CCR in the CCR unit.(3) The owner or operator has completed the demonstration required by paragraph (a) of this Section when the demonstration is approved by the DEQ and placed in the facility's operating record as required by OAC 252:517-19-1(e).(4) An owner or operator of an existing CCR surface impoundment who fails to demonstrate compliance with the requirements of paragraph (a) of this Section by the date specified in paragraph (c)(1) of this Section is subject to the requirements of OAC 252:517-15-6(b)(1).(5) An owner or operator of a new CCR landfill, new CCR surface impoundment, or any lateral expansion of a CCR unit who fails to make the demonstration showing compliance with the requirements of paragraph (a) of this Section is prohibited from placing CCR in the CCR unit.(6) The owner or operator must submit the demonstrations to DEQ for approval.(d) Recordkeeping. The owner or operator of the CCR unit must comply with the recordkeeping requirements specified in OAC 252:517-19-1(e), the notification requirements specified in OAC 252:517-19-2(e), and the Internet requirements specified in OAC 252:517-19-3(e).