SECTION 252:517-7-5. Drilling


Latest version.
  • (a)   Notice of intent to drill. After DEQ approval of the drilling plan, the DEQ shall be provided with written notice of intent to drill at least two (2) weeks prior to initiating drilling.
    (b)   Drilling. Provided proper notification is given to the DEQ, drilling may proceed in accordance with the approved plan even if a representative of the DEQ is not present as scheduled.
    (c)   Qualified groundwater scientist. A qualified groundwater scientist shall supervise all drilling operations.
[Source: Added at 33 Ok Reg 1469, eff 9-15-16]