SECTION 252:623-11-1. Periodic compliance reports  


Latest version.
  • (a)   At least once every six (6) months, significant industrial users must submit to the DEQ a report indicating the nature and concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. Based on site specific information, the DEQ may require more frequent reports. All periodic compliance reports must be signed and certified in accordance with Subchapter 7 of this Chapter.
    (b)   All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.
    (c)   If a user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the DEQ, using the procedures prescribed in this Subchapter, the results of this monitoring shall be included in the report.
[Source: Added at 18 Ok Reg 1601, eff 6-1-01]