SECTION 252:623-9-2. Permit contents  


Latest version.
  •   A wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the DEQ to meet the requirements of this Chapter.
    (1)   Wastewater discharge permits must contain:
    (A)   A statement that indicates wastewater discharge permit duration;
    (B)   A statement that the wastewater discharge permit is nontransferable without prior notification to the DEQ in accordance with this Subchapter, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit;
    (C)   Effluent limits based on applicable pretreatment standards and the Central Treatment Trust's capacity for treating wastewater;
    (D)   Self-monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on Federal, State, and local law; and
    (E)   A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedules may not extend the compliance date beyond federal or state deadlines;
    (F)   When required, a slug control plan that meets the requirements of OAC 252:623-5-3.
    (2)   Wastewater discharge permits may contain the following additional conditions:
    (A)   Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization;
    (B)   Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works;
    (C)   Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or nonroutine discharges;
    (D)   Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW;
    (E)   The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW;
    (F)   Requirements for installation and maintenance of inspection and sampling facilities and equipment;
    (G)   A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable Federal and State pretreatment standards, including those which become effective during the term of the wastewater discharge permit; and
    (H)   Other conditions as deemed appropriate by the DEQ to ensure compliance with this Chapter, and State and Federal laws, rules, and regulations.
[Source: Added at 18 Ok Reg 1601, eff 6-1-01; Amended at 24 Ok Reg 1535, eff 6-15-07]