SECTION 252:653-7-3. Additional application requirements for recharge wells  


Latest version.
  •   In addition to the requirements of OAC 252:653-7-2, permit applications for the construction of recharge wells shall include the following:
    (1)   construction details to include, at a minimum, depth and diameter of casings and screens (or open hole completion), description of the installation method, construction features and specifications for the materials to be used;
    (2)   plugging and abandonment plan;
    (3)   proposed injection procedure;
    (4)   proposed operating data:
    (A)   average and maximum daily injection rates and volumes for each well;
    (B)   average and maximum injection pressure; and
    (C)   description of the injectate parameters to be monitored;
    (5)   any additional information DEQ determines to be necessary for the specific ASR project.
[Source: Added at 35 Ok Reg 1333, eff 9-15-18]