SECTION 252:653-9-4. Permit application requirements  


Latest version.
  •   The following shall be included in an application for an operations permit for an ASR project:
    (1)   Site description. A description of the ASR site which includes, at a minimum, a legal description of the site, a discussion of all surface facilities, and a description of the area of hydrologic effect.
    (2)   Map. A map showing the constructed ASR project for which a permit is being sought.
    (3)   Operations. Proposed operating parameters.
    (4)   Contingency plan. Contingency plans to address system failures.
    (5)   Groundwater monitoring plan. A plan for monitoring groundwater for changes in aquifer pressure and water quality.
    (6)   Water delivery pilot test results. Results of the water delivery pilot test conducted as required in Subchapter 7 of this Chapter.
    (7)   Operation and maintenance. Operation and maintenance requirements for the ASR system as required in this Subchapter.
    (8)   Closure Plan. A closure plan for the ASR system.
    (9)   Cost Estimates. Cost estimates for closure of the facility.
    (10)   Financial assurance. Financial assurance to cover the cost of closing the facility.
    (11)   Horizontal and vertical extent of stored water. A map showing the estimated maximum extent of stored water and discussion of the method and assumption used.
    (12)   Additional information. Any additional information DEQ determines to be necessary for the specific ASR project.
[Source: Added at 35 Ok Reg 1333, eff 9-15-18]