Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 653. Aquifer Storage and Recovery |
Subchapter 9. Aquifer Storage & Recovery Operations |
SECTION 252:653-9-6. Operation and maintenance of recharge wells
Latest version.
- (1) Injection pressure. Injection pressure at the wellhead shall not exceed a maximum which shall be calculated so as to assure the pressure in the injection zone does not cause movement of fluid out of the injection zone.(2) Mechanical integrity. The owner or operator shall maintain the mechanical integrity of all recharge wells operated under this Subchapter.(3) Continuous monitoring. The recharge well(s) shall be monitored continuously, to include at a minimum, monitoring of the injectate for flow, injection pressure and any constituents required by DEQ.(b) Maintenance. The method and schedule for maintaining recharge wells shall be included. This shall also provide for redevelopment procedures.