Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 656. Water Pollution Control Facility Construction Standards |
Subchapter 3. Permit Procedures |
SECTION 252:656-3-10. Operation and Maintenance (O & M) Manual
Latest version.
- Within ninety (90) days of the completion of the construction, the applicant must submit to the DEQ an O & M Manual for the operation and maintenance of the wastewater treatment system or the water reuse system. The O & M Manual must include at a minimum:(1) System Treatment Requirements;(2) Current NPDES Permit wasteload requirements to water quality sections of OAC 252:606 including 208 Plan requirements;(3) Description, Operation and Control of the Treatment Works;(4) Control of Unit Processes;(5) Laboratory Testing;(6) Common Operating Problems;(7) Start-Up Testing and Procedures;(8) Normal Operating Procedures;(9) Alternative and Emergency Operations;(10) Emergency Shutdown Operations and Emergency Response;(11) Records Control and Retention;(12) Safety;(13) Wastewater Treatment System Maintenance Requirements and/or Water Reuse System Maintenance Requirements;(14) Spare Parts and Chemical Inventory(15) Reclaimed water storage and distribution system flushing plan to prevent slime growth, regrowth of pathogens and water age;and(16) Best Management Practices for Category 6 uses within a wastewater treatment plant.