Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 300. Grand River Dam Authority |
Chapter 35. Lake Rules |
Subchapter 13. Permits for Dikes, Excavations, Dredgings, Erosion Control Devices, Retaining Walls, and Shoreline Stabilization |
SECTION 300:35-13-2. Erosion control devices
Latest version.
- (a) Erosion control devices may be permitted to protect the existing shoreline. These types of structures must not be for the purpose of landscaping or beautifying the area and will only be permitted if GRDA staff determines that the device is necessary for effective erosion control. In some cases, permission may also be required from the U.S. Army Corps. of Engineers.(b) During construction activities, GRDA shall require that appropriate erosion and sediment control measures be utilized to prevent pollution of GRDA waters.(c) All material which accumulates behind sediment control devices shall be removed from GRDA land and placed at an upland site above the applicable flowage easement.(d) Disturbed sites must be promptly stabilized with GRDA approved methods associated with seeding, vegetative planting, erosion control netting, and/or mulch or sediment stabilization material.(e) Vegetation removed for erosion control projects must be replaced with GRDA approved species of native vegetation.