SECTION 380:25-7-3. Boilers and pressure vessels improperly prepared for inspection  


Latest version.
  •   If a boiler or pressure vessel has not been properly prepared for an internal inspection, or if the owner or user fails to comply with the requirements for a pressure test as set forth in these rules, the Inspector may decline to make the inspection or test and the Certificate of Operation may be withheld or right to operate revoked, until the owner or user complies with the requirements.