SECTION 380:25-7-9. Boiler blowoff equipment  


Latest version.
  • (a)   The blowdown from a boiler or boilers that enters a sanitary sewer system or blowdown which is considered a hazard to life or property shall pass through some form of blowoff equipment that will reduce pressure and temperature as required hereinafter.
    (b)   All blowoff equipment shall be fitted with openings to facilitate cleaning and inspection.