SECTION 380:50-17-14. Demolition procedures


Latest version.
  •   For structures to be demolished and for which there is no probability of occupancy, the Department of Labor will, upon application, generally relax some procedures, including:
    (1)   Sections 380:50-11-1(1) and (2) on personal and area monitoring, providing workers are in pressure-demand, supplied-air respirators.
    (2)   Section 380:50-11-1(3) on outside sampling, provided there are no adjacent occupied areas.
    (3)   Section 380:50-11-2 on clearance monitoring and Sections 380:50-17-4(7) through 380:50-17-4(9), and Sections 380:50-17-8(2) through 380:50-17-8(4), on contractor procedures, providing all surfaces are thoroughly sprayed with a lock-down encapsulant after cleanup.
[Source: Amended at 9 Ok Reg 3309, eff 7-27-92; Amended at 18 Ok Reg 3523, eff 9-14-01]