SECTION 460:30-3-11. Mining permit maps: Operations and reclamation plan


Latest version.
  •   Each application shall contain the following operations and reclamation plan maps:
    (1)   Buildings, roads, facilities, and utility lines to be used.
    (2)   The detailed operation, according to the sequence of CCB placement.
    (3)   Each topsoil, cover material, CCB, and non-CCB waste storage area.
    (4)   Each water storage, treatment, discharge, and diversion facility to be used.
    (5)   Each air pollution control facility.
    (6)   Location of each sedimentation pond and permanent impoundment.
    (7)   A contoured map showing the final surface configuration of the disturbed area.
[Source: Added at 20 Ok Reg 2819, eff 8-26-03]