SECTION 595:30-3-22. Agriculture permits  


Latest version.
  •   Agriculture permits shall be governed by 47 O.S. §14-118(e).
    (1)   Transporting of raw forest products shall not be permitted on the National System of Interstate and Defense Highways and shall require:
    (A)   An annual permit with a fee of Twenty-five Dollars ($25.00)
    (B)   Truck and trailer information shall be given to the Size and Weight Permit Division of the Department of Public Safety.
    (C)   The regulation "Oversize Load" sign and flagging are required, as provided in 595:30-3-16.
    (2)   Transporting of round baled hay requires:
    (A)   An annual permit with a fee of Twenty-five Dollars ($25.00).
    (B)   Truck and trailer information shall be given to the Size and Weight Permit Division of the Department of Public Safety.
    (C)   The regulation "Oversize Load" sign and flagging are required, as provided in 595:30-3-16.
    (3)   Transporting of soil conservation equipment requires:
    (A)   An annual permit with a fee of Twenty-five Dollars ($25.00).
    (B)   Truck and trailer information shall be given to the Size and Weight Permit Division of the Department of Public Safety.
    (C)   Travel on the National System of Interstate and Defense Highways shall not be permitted.
    (D)   The regulation "Oversize Load" sign and flagging are required, as provided in 595:30-3-16.
[Source: Amended at 9 Ok Reg 2577, eff 6-26-92; Amended at 11 Ok Reg 229, eff 10-10-93 (emergency); Amended at 11 Ok Reg 2391, eff 5-26-94; Amended at 14 Ok Reg 3508, eff 8-12-97; Amended at 16 Ok Reg 3159, eff 7-12-99; Added at 17 Ok Reg 3029, eff 8-15-00; Amended at 17 Ok Reg 3040, eff 7-15-00; Amended at 26 Ok Reg 2780, eff 7-25-09; Amended at 28 Ok Reg 2092, eff 7-15-11; Amended at 36 Ok Reg 1050, eff 7-25-19]