- The Authority shall document in the acquisition file if a bid is non-responsive and should be rejected on that basis. A bid may be rejected for reasons including, but not limited, to the following:(1) Late bids received after the closing date and time;(2) Failure to meet the terms and conditions of the solicitation;(3) Missing forms or other required information;(4) Incomplete forms;(5) Illegible forms or forms not submitted in the proper format;(6) Alterations appearing without initials of the person making the alteration;(7) Use of an unauthorized signature when an authorized signature is required;(8) Absence of a notary seal when and if a form calls for same;(9) Missing bid bond or other surety;(10) Items and/or services offered are not suitable for the intended use;(11) Bid pricing does not meet the requirements of a solicitation or is determined by the evaluation committee to be excessive; and(12) Failure to acknowledge a solicitation amendment.