SECTION 785:25-9-9. Breach analysis for existing dams  


Latest version.
  •   If an existing dam does not have a breach analysis, and a failure might put lives at risk downstream, then after the next regularly scheduled inspection the Board's Engineer may direct the owner to provide a breach analysis and breach inundation map, utilizing modeling and analysis guidelines provided by the Board, and according to a reasonable schedule of compliance.
[Source: Added at 27 Ok Reg 1300, eff 5-27-10]