SECTION 785:46-17-6. Technical information and procedures to implement Plan  


Latest version.
  •   In implementing its Plan, the Board will utilize stream gauge data from the U.S. Geological Survey, U.S. Army Corps of Engineers, and the Board itself; watershed delineation and runoff estimation model; Informix and Oracle databases for water rights and well logs; Optika eMedia software for review of images of water rights files; ArcInfo and ArcView GIS software and associated hydrologic development tools for data analysis and mapping; precipitation and evaporation data from the National Weather Service and Oklahoma Climatological Survey; MODFLOW modeling software; ACCESS database for groundwater quality data; analytical models such as capture zone analysis, TWODAN or other models to determine well interference, potential capture of stream water or movement of contaminated groundwater; National Inventory of Dams database; DOS based QuickRoute software for the evaluation of spillway and freeboard adequacy and overtopping failure analysis of dam impoundments; data collected by the Clean Lakes Diagnostic Studies Program, Oklahoma Water Watch Program, Beneficial Use Monitoring Program, Oklahoma Conservation Commission, Oklahoma Department of Mines, Oklahoma Corporation Commission, DEQ, and local and county cooperators.
[Source: Added at 18 Ok Reg 3379, eff 8-13-01]