Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 515. Management of Solid Waste |
Subchapter 1. General Provisions |
SECTION 252:515-1-1. Authority and applicability |
SECTION 252:515-1-2. Definitions |
SECTION 252:515-1-3. Terms not defined by Act or rule |
SECTION 252:515-1-4. Test methods and map scales |
SECTION 252:515-1-5. Consideration of other laws |
SECTION 252:515-1-6. Severability |
SECTION 252:515-1-7. Beneficial reuse |
SECTION 252:515-1-8. Special considerations |
Subchapter 3. Permit Provisions and Applications |
Part 1. GENERAL PROVISIONS |
Part 3. PERMIT APPLICATIONS AND MODIFICATIONS |
Part 5. REQUIRED MAPS AND DRAWINGS |
Part 7. ADDITIONAL MAPS FOR LAND DISPOSAL FACILITIES |
Subchapter 5. Location Restrictions |
Part 1. GENERAL PROVISIONS |
Part 3. LOCATION RESTRICTIONS FOR ALL SOLID WASTE DISPOSAL FACILITIES |
Part 5. ADDITIONAL LOCATION RESTRICTIONS FOR LAND DISPOSAL FACILITIES |
Subchapter 7. Subsurface Investigation |
Part 1. GENERAL PROVISIONS |
Part 3. DATA COLLECTION |
Part 5. GROUNDWATER STUDY |
Part 7. SURFACE PENETRATION PLUGGING |
Subchapter 9. Groundwater Monitoring/Corrective Action |
Part 1. GENERAL PROVISIONS |
Part 3. BACKGROUND WATER QUALITY |
Part 5. STATISTICAL METHOD |
Part 7. DETECTION MONITORING |
Part 9. ASSESSMENT MONITORING |
Part 11. ASSESSMENT OF CORRECTIVE MEASURES |
Part 13. SELECTION OF REMEDY |
Part 15. IMPLEMENTATION OF CORRECTIVE ACTION |
Subchapter 11. Liner Design |
Part 1. GENERAL PROVISIONS |
Part 3. RECONSTRUCTED CLAY LINER |
Part 5. FLEXIBLE MEMBRANE LINER |
Part 7. IN-SITU LINER |
Subchapter 13. Leachate Collection and Management |
Part 1. GENERAL PROVISIONS |
Part 3. DESIGN |
Part 5. LEACHATE MANAGEMENT |
Subchapter 15. Methane Gas Monitoring and Control |
SECTION 252:515-15-1. Applicability |
SECTION 252:515-15-2. Explosive gas control |
SECTION 252:515-15-3. Explosive gas monitoring and analysis |
SECTION 252:515-15-4. Installation of gas monitoring probes |
SECTION 252:515-15-5. Levels exceeding limits detected |
Subchapter 17. Stormwater Management |
SECTION 252:515-17-1. Applicability |
SECTION 252:515-17-2. Run-on/run-off control systems |
SECTION 252:515-17-3. Discharges |
Subchapter 19. Operational Requirements |
Part 1. GENERAL PROVISIONS |
Part 3. OPERATIONAL REQUIREMENTS FOR ALL DISPOSAL FACILITIES |
Part 5. COVER AND SOIL BORROW REQUIREMENTS FOR LAND DISPOSAL FACILITIES |
Part 7. ADDITIONAL OPERATIONAL REQUIREMENTS FOR MSWLFS |
Part 9. ADDITIONAL OPERATIONAL REQUIREMENTS FOR WASTE PROCESSING FACILITIES |
Part 11. ADDITIONAL OPERATIONAL REQUIREMENTS FOR SOLID WASTE COMPOSTING FACILITIES [revoked] |
Part 13. WHEEL WASHES |
Subchapter 21. Used Tire Processing, Certification, Permits and Compensation |
Part 1. GENERAL PROVISIONS |
Part 3. USED TIRE FACILITIES |
Part 5. USED TIRE TRANSPORTATION |
Part 7. COMPENSATION FROM THE USED TIRE INDEMNITY FUND |
Part 9. EROSION CONTROL, RIVER BANK STABILIZATION AND OTHER CONSERVATION PROJECTS [revoked] |
Part 11. USED TIRE BALING |
Part 13. TIRE DEALER AND MOTOR LICENSE AGENT AUDITS |
Subchapter 23. Regulated Medical Waste Management |
Part 1. GENERAL PROVISIONS |
Part 3. OPERATIONAL REQUIREMENTS FOR ALL COMMERCIAL REGULATED MEDICAL WASTE PROCESSING FACILITIES |
Part 5. ADDITIONAL OPERATIONAL REQUIREMENTS FOR COMMERCIAL REGULATED MEDICAL WASTE INCINERATORS |
Subchapter 25. Closure and Post-Closure Care |
Part 1. GENERAL PROVISIONS |
Part 3. CLOSURE |
Part 5. POST-CLOSURE |
Subchapter 27. Cost Estimates and Financial Assurance |
Part 1. GENERAL PROVISIONS |
Part 3. COST ESTIMATES |
Part 5. DETERMINATION OF COST ESTIMATES |
Part 7. FINANCIAL ASSURANCE MECHANISMS |
Subchapter 29. Exclusion of Prohibited Wastes |
SECTION 252:515-29-1. Applicability |
SECTION 252:515-29-2. General provisions |
SECTION 252:515-29-3. WEP requirements |
SECTION 252:515-29-4. Maintain records |
Subchapter 31. NHIW Management |
SECTION 252:515-31-1. Applicability and exclusion |
SECTION 252:515-31-2. Identification of NHIW and exclusion |
SECTION 252:515-31-3. Generator requirements |
SECTION 252:515-31-4. Disposal facility requirements |
Subchapter 33. Waste Collection and Transportation |
SECTION 252:515-33-1. Applicability |
SECTION 252:515-33-2. Transportation to permitted facility |
SECTION 252:515-33-3. Requirements for cities and towns |
SECTION 252:515-33-4. Adequate enclosure |
Subchapter 35. Oklahoma Recycling Initiative |
SECTION 252:515-35-1. Applicability |
SECTION 252:515-35-2. Project development |
SECTION 252:515-35-3. Reimbursement |
SECTION 252:515-35-4. Penalties |
Subchapter 37. Landfill Gas Incentive Payments |
SECTION 252:515-37-1. Authority and applicability |
SECTION 252:515-37-2. Funding |
SECTION 252:515-37-3. Proposal required |
SECTION 252:515-37-4. Life of project |
SECTION 252:515-37-5. Content of proposal |
SECTION 252:515-37-6. Encumbrance of funds |
SECTION 252:515-37-7. Reimbursement |
SECTION 252:515-37-8. Contract renewal |
SECTION 252:515-37-9. Prioritization of funding |
SECTION 252:515-37-10. Penalties |
Subchapter 39. Oklahoma E-Waste Recycling |
SECTION 252:515-39-1. Purpose, authority and applicability |
SECTION 252:515-39-2. Definitions |
SECTION 252:515-39-3. General provisions |
SECTION 252:515-39-4. Annual fees |
SECTION 252:515-39-5. Records |
Subchapter 41. Roofing Material Recycling |
SECTION 252:515-41-1. Purpose, authority, and applicability |
SECTION 252:515-41-2. Definitions |
SECTION 252:515-41-3. Permit requirements |
SECTION 252:515-41-4. Prohibition |
SECTION 252:515-41-5. Duration of permit |
SECTION 252:515-41-6. Permit transfer |
SECTION 252:515-41-7. Permit applications and requirements |
SECTION 252:515-41-8. Variance from the rules of this Chapter |
SECTION 252:515-41-9. Oath required |
SECTION 252:515-41-10. Legal right to property |
SECTION 252:515-41-11. Permit applications |
SECTION 252:515-41-12. Operational requirements |
SECTION 252:515-41-13. Reporting requirements |
SECTION 252:515-41-14. Financial assurance |
SECTION 252:515-41-15. Closure |
SECTION 252:515-41-16. Stormwater management |
Subchapter 43. Composting Facilities |
Part 1. GENERAL PROVISIONS |
Part 3. PLANS AND PERMITS |
Part 5. OPERATIONAL STANDARDS |
Part 7. DESIGN STANDARDS |
Part 9. GROUNDWATER MONITORING |
Part 11. COMPOST TESTING STANDARDS |
Appendix A. Constitutents for Detection Monitoring |
Appendix B. Uppermost Aquifer Protective Values |
Appendix C. List of Hazardous Inorganic and Organic Constituents |
Appendix D. Borings in Drilling Plan |
Appendix E. Borehole Depth Calculation Table |
Appendix F. NHIW Wastestreams |
Appendix G. NHIW Certification Form |
Appendix H. Procedure for Calculating Closure Cost Estimates for Financial Assurance |
Appendix I. Procedure for Calculating Post-Closure Cost Estimates for Financial Assurance |
Note
[Authority: 27A O.S. § 1-3-101, 2–2–101, 2–2–201, 2–10–101 et seq., 2–11–401 et seq., 2–11–601 et seq.]
[Source: Codified 6-6-03]