SECTION 252:515-11-31. Liner construction standards  


Latest version.
  • (a)   MSWLFs, NHIW landfills and other land disposal facilities. The reconstructed clay liner portion of the composite liner system must:
    (1)   be at least two feet thick with a hydraulic conductivity no greater than 1.0 x 10-7 cm/sec; and
    (2)   meet the requirements of and be constructed in accordance with this Part and the approved QA/QC plan.
    (b)   C&D landfills. A reconstructed clay liner installed at a C&D landfill must:
    (1)   be at least three feet thick with a hydraulic conductivity no greater than 1.0 x 10-5 cm/sec; and
    (2)   meet the requirements of and be constructed in accordance with this Part and the approved QA/QC plan.
[Source: Added at 20 Ok Reg 1151, eff 6-1-03]