Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 515. Management of Solid Waste |
Subchapter 13. Leachate Collection and Management |
Part 3. DESIGN |
SECTION 252:515-13-35. Construction report
Latest version.
- (a) Report required. A final construction report of the leachate collection system shall be submitted to the DEQ.(b) Report details. The construction report shall include:(1) invert elevations to the nearest 0.01 foot at least every 25 feet along each collection pipe, changes in grade, and at all connections to structures.(2) a map showing the locations of system components tied to at least two permanent monuments;(3) the results of storage tank leak detection tests, if applicable;(4) any deviations from the approved construction plan made necessary by changes of circumstances;(5) the method for phased tie-in of leachate collection pipes;(6) the date and results of the first cleanout of the collection pipes; and(7) as constructed drawings, calculations and other pertinent data to demonstrate compliance with this Part.(c) DEQ approval required. The construction report shall be approved by the DEQ before the placement of waste.