SECTION 252:515-25-51. Post-closure period  


Latest version.
  • (a)   8-year post-closure monitoring. The following facilities shall conduct post-closure monitoring in accordance with this Part for a minimum of eight (8) years after DEQ approval of final closure:
    (1)   new or currently active C&D landfills; and
    (2)   new or currently active generator owned and operated NHIW landfills.
    (b)   30-year post-closure monitoring. New or currently active MSWLFs and other land disposal facilities shall conduct post-closure monitoring in accordance with this Part for a minimum of thirty (30) years after DEQ approval of final closure.
    (c)   Non-land disposal facilities. Non-land disposal facilities shall conduct post-closure monitoring and care for a period specified by the DEQ if it is determined that post-closure monitoring and care are necessary due to soil or surface or groundwater contamination from activities performed at the facility.
[Source: Added at 20 Ok Reg 1151, eff 6-1-03]