Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 515. Management of Solid Waste |
Subchapter 3. Permit Provisions and Applications |
Part 7. ADDITIONAL MAPS FOR LAND DISPOSAL FACILITIES |
SECTION 252:515-3-74. Highest groundwater contour map
Latest version.
- (a) Required map. The permit application shall include a groundwater contour map developed from the information obtained during the groundwater study required in Part 5 of OAC 252:515-7.(b) Required details. The groundwater contour map shall depict:(1) the groundwater contours, at two foot intervals, of the highest groundwater elevation ever recorded at each borehole, piezometer or well across the site. The highest elevation shall be based on the groundwater levels recorded during the subsurface investigation or any other record of groundwater elevation measurements; and(2) the locations of all proposed monitoring wells, boreholes, and piezometers, and the surface elevations of each.