Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 616. Industrial Wastewater Systems |
Subchapter 13. Closure Standards |
SECTION 252:616-13-5. Post-closure maintenance plan (PCMP)
Latest version.
- When requested by the DEQ, the owner or operator shall submit a written post-closure maintenance plan (PCMP) to the DEQ. At a minimum, the PCMP shall include the following information, as well as other information requested by the DEQ:(1) Name, address, and telephone number of the person(s) responsible for the facility and a contact person for the site;(2) Discussion of all procedures for maintaining the site (e.g., erosion control, such as vegetative cover, surface contouring, and surface water drainage) and post-closure use of the site;(3) Description of post-closure monitoring, as requested by the DEQ, including parameters sampled, frequency, location of monitoring sites, and reporting of monitoring data; and(4) Procedures used to protect impervious caps, covers, or other methods used to treat and contain the waste for in-place closure.