SECTION 380:25-3-26. Requirements for new installations  


Latest version.
  •   Except for State of Oklahoma authorized owner/user Inspection Agencies, the installer must notify the Bureau of Boiler Inspection prior to installation. No boiler or pressure vessel shall hereafter be installed in this State unless it has been constructed in conformity with the ASME Code and installed in conformity with the requirements of this Chapter except:
    (1)   Those exempt by the Act;
    (2)   Those outlined by the rules of this Chapter; and
    (3)   Those hot water supply heaters constructed to a national standard.