SECTION 380:50-17-10. Re-establishment of the work area and systems  


Latest version.
  •   Re-establishment of the work area shall occur only after the following sequence of procedures has been performed and documented to the satisfaction of the Commissioner:
    (1)   After satisfactory completion of the required visual inspection by DOL, clearance testing according to Section 380:50-11-2 shall be conducted.
    (2)   Remaining poly shall be removed from walls and floors and disposed of as ACM, maintaining decontamination enclosure systems and critical barriers as required.
    (3)   The contractor shall notify the Commissioner for an inspection of the work area for any remaining visible residue, if such inspection was not waived by the Inspector at the time of the visual inspection. Evidence of contamination will necessitate additional cleaning requirements in accordance with Section 380:50-17-8.
    (4)   Additional air monitoring shall be performed if additional cleanup is necessary.
    (5)   Critical barriers may be removed and disposed of as asbestos-contaminated waste.
    (6)   Replace all items or equipment removed in accordance with Section 380:50-17-4(4), as appropriate.
[Source: Amended at 9 Ok Reg 3309, eff 7-27-92; Amended at 18 Ok Reg 3523, eff 9-14-01; Amended at 27 Ok Reg 1887, eff 7-1-10]