SECTION 460:20-43-48. Subsidence control: public notice  


Latest version.
  •   At least 6 months prior to mining, or within that period if approved by the Department, the underground mine operator shall mail a notification to all owners and occupants of surface property and structures above the underground workings. The notification shall include, at a minimum, identification of specific areas in which mining will take place, dates that specific areas will be undermined, and the location or locations where the operator's subsidence control plan may be examined.