Oklahoma Administrative Code (Last Updated: March 11, 2021) |
TITLE 252. Department of Environmental Quality |
Chapter 517. Disposal of Coal Combustion Residuals from Electric Utilities |
Subchapter 1. General Provisions |
SECTION 252:517-1-1. Scope and purpose |
SECTION 252:517-1-2. Applicability of other regulations |
SECTION 252:517-1-3. Definitions |
SECTION 252:517-1-4. Terms not defined by Act or rule |
SECTION 252:517-1-5. Test methods and map scale |
SECTION 252:517-1-6. Severability |
SECTION 252:517-1-7. Permits |
Subchapter 3. Permit Provisions and Applications |
Part 1. GENERAL PROVISIONS |
Part 3. REQUIRED MAPS AND DRAWINGS |
Subchapter 5. Location Restrictions |
SECTION 252:517-5-1. Placement above the uppermost aquifer |
SECTION 252:517-5-2. Wetlands |
SECTION 252:517-5-3. Fault areas |
SECTION 252:517-5-4. Seismic impact zones |
SECTION 252:517-5-5. Unstable areas |
SECTION 252:517-5-6. Scenic rivers |
SECTION 252:517-5-7. Recreation/preservation areas |
SECTION 252:517-5-8. Endangered or threatened species |
SECTION 252:517-5-9. 100-year floodplain |
SECTION 252:517-5-10. Public water supply |
SECTION 252:517-5-11. Wellhead protection area |
Subchapter 7. Subsurface Investigation |
Part 1. GENERAL PROVISIONS |
Part 3. DATA COLLECTION |
Part 5. GROUNDWATER STUDY |
Part 7. SURFACE PENETRATION PLUGGING |
Subchapter 9. Groundwater Monitoring/Corrective Action |
SECTION 252:517-9-1. General provisions |
SECTION 252:517-9-2. Groundwater monitoring systems |
SECTION 252:517-9-3. [Reserved] |
SECTION 252:517-9-4. Groundwater sampling and analysis requirements |
SECTION 252:517-9-5. Detection monitoring program |
SECTION 252:517-9-6. Assessment monitoring program |
SECTION 252:517-9-7. Assessment of corrective measures |
SECTION 252:517-9-8. Selection of remedy |
SECTION 252:517-9-9. Implementation of the corrective action program |
Subchapter 11. Design Criteria |
SECTION 252:517-11-1. Design criteria for new CCR landfills and any lateral expansion of a CCR landfill |
SECTION 252:517-11-2. Liner design criteria for existing CCR surface impoundments |
SECTION 252:517-11-3. Liner design criteria for new CCR surface impoundments and any lateral expansion of a CCR surface impoundment |
SECTION 252:517-11-4. Structural integrity criteria for existing CCR surface impoundments |
SECTION 252:517-11-5. Structural integrity criteria for new CCR surface impoundments and any lateral expansion of a CCR surface impoundment |
Subchapter 13. Operational Requirements |
SECTION 252:517-13-1. Air criteria |
SECTION 252:517-13-2. Run-on and run-off controls for CCR landfills |
SECTION 252:517-13-3. Hydrologic and hydraulic capacity requirements for CCR surface impoundments |
SECTION 252:517-13-4. Inspection requirements for CCR surface impoundments |
SECTION 252:517-13-5. Inspection requirements for CCR landfills |
SECTION 252:517-13-6. Discharges |
SECTION 252:517-13-7. Leachate collection and management for CCR Landfills |
Subchapter 15. Closure and Post-Closure Care |
SECTION 252:517-15-1. Performance standard |
SECTION 252:517-15-2. DEQ Notification |
SECTION 252:517-15-3. Certification of final closure |
SECTION 252:517-15-4. Final closure |
SECTION 252:517-15-5. Inactive CCR surface impoundments |
SECTION 252:517-15-6. Closure or retrofit of CCR units |
SECTION 252:517-15-7. Criteria for conducting the closure or retrofit of CCR units |
SECTION 252:517-15-8. Alternative closure requirements |
SECTION 252:517-15-9. Post-closure care requirements |
SECTION 252:517-15-10. Post-closure use of property |
SECTION 252:517-15-11. Certification of post-closure performance |
SECTION 252:517-15-12. Land use restrictions |
Subchapter 17. Cost Estimates and Financial Assurance |
Part 1. GENERAL PROVISIONS |
Part 3. COST ESTIMATES |
Part 5. DETERMINATION OF COST ESTIMATES |
Part 7. FINANCIAL ASSURANCE MECHANISMS |
Subchapter 19. Record Keeping, Notification, and Posting of Information to the Internet |
SECTION 252:517-19-1. Recordkeeping requirements |
SECTION 252:517-19-2. Notification requirements |
SECTION 252:517-19-3. Publicly accessible internet site requirements |
Appendix A. Constituents for Detection Monitoring |
Appendix B. Constituents for Assessment Monitoring |
Appendix C. Borings in Drilling Plan |
Appendix D. Borehole Depth Calculation Table |
Appendix E. Procedures for Calculating Closure Cost Estimates for Financial Assurance |
Appendix F. Procedure for Calculating Post-Closure Cost Estimates for Financial Assistance |
Note
[Authority: 27A O.S., §§ 1-3-101, 2-2-101, 2-10-201, and 2-10-301(D)]
[Source: Codified 9-15-16]